SAFe PO Certification Answers







SAFe PO Certification is given by SAFe and with SAFe PO Certification you can demonstrate your mastery of Agile Methodology. The SAFe PO Certified users will have professionally capable of working in Agile environment. You have to complete all course videos, modules, and assessments and receive a minimum score of 80% on each assessment to receive credit. SAFe PO Certification will make you expert in SAFe PO, through which you can converts into leads and new customers and gain benefit in your business or career .




Other Important SAFe Exam Links – Must visit

You should visit our few findings below for success in exam
1. SAFe PO Certification Official Link
2. Completed SAFe PO Certification Exam Answers
3. Completed SAFe PO Certification Exam Details
3. Other Best Free Certification Exam Details

ServiceCentreList.com is providing the answer of questions asked in SAFe PO Certification exam. With these answers you will be able to score 100%+ exam and can get SAFe PO Certification. For that you need to just attempt all the questions mentioned for SAFe PO Certification.



SAFe PO Certification Questions Answers

1. What are three elements of Agile Team capacity allocation that ensure a healthy balance of work? (Choose three.)

Free time for innovation
User Stories
Maintenance
Dependencies
Refactors
Severity-1 defects



2. Which two groups should attend every Iteration Review? (Choose two.)

Business Owners
The team’s Product Owner
Product Owners on dependent teams
The team’s Scrum Master
The team members’



3. A Product Owner is noticing that overall quality is starting to degrade. What might they do to address the problem?

Allocate more capacity to Enablers
Add a QA Iteration to address quality issues
Spend more time in PI Planning
Reinforce the definition of done



4. SAFe recommends separating deployment from release. What can help with this practice?

Manually test Features and nonfunctional requirements
Deploying to staging every 4 to 8 weeks
A staging environment that emulates testing
Hide all new functionality under Feature toggles



5. The recommended structure for writing User Stories is?

I want…, When…, So that…
Given…, When…., Then…
As a…, I want…, So that…
As a…, When…, Then…



6. When should a dependency be added to the program risks?

When it must be accepted
When it can be resolved
When an Enabler can fix it
When it can be deferred



7. What are two strategies a Product Owner can use during Program Increment Planning to minimize dependencies?

Move Stories on their team’s backlog to another team
Split Stories to eliminate dependencies
Change the definition of done
Reprioritize Epics
Move teams to another Agile Release Train



8. What is one of the questions the Product Management team must answer in order to create a Vision?

What are the team’s skills
Which problem will the Solution solve
Which themes are on the Roadmap
How many Features have already been released to the Customer



9. How do SAFe Continuous Delivery Pipeline activities map to the teams’ work each Iteration within the Program Increment (PI)?

Each Iteration in the PI, teams are exploring, integrating, deploying, but releasing only occurs at the end of the PI
Features are explored in one PI, given to the teams in later PIs for integrating and deploying, and then released in a future PI
Early Iterations focus on exploring, the later Iterations focus on integrating and deploying, and releasing
Each Iteration in the PI, teams are exploring, integrating, deploying, and potentially releasing new value



10. Features are sized or split to fit what duration?

A Program Increment
A release
A Solution Epic
An Iteration



11. What is the purpose of the Solution Context?

To enable marketing to create better marketing campaigns
To guide Product Management in prioritizing Features
To identify critical aspects of a Solution’s operational environment
To assist sales and service organizations in configuring complex solutions



12. The team is struggling to agree on the Story point sizing of a new User Story. The Product Owner was previously a related domain expert and feels the team is wasting time. What should she do?

Make the team aware of her expertise and decide the size for them
Instruct the Scrum Master to resize the Story
Suggest the team stop the sizing of the User Story and add it to the next Iteration as-is
Continue to support the team’s decision on sizing



13. What does assigning business value to a team’s PI Objectives influence?

How the Kanban work in process limits are set
How teams plan the implementation
How often the teams deploy
How to achieve objectives



14. During the Program Increment Planning meetings the Product Owner coordinates with other Product Owners, shared resources, and who else?

The Customer
The System Architect/Engineer
The Solution Train Engineer
Product Management



15. What is the primary focus of an operational Value Stream?

Delivering end-user value
Orchestrating supply chain networks
Improving business operations
Lowering operational costs



16. What is an input to the Program Increment Planning process that highlights how Product Management plans to accomplish the Vision?

Program board
Business context
Top ten Features
Team Backlogs



17. What are three elements of INVEST?

Elegant
Simple
Nimble
Independent
Valuable
Testable



18. What are two ways in which the SAFe House of Lean might influence a Product Owner?

Help Agile Teams gain a clear understanding of their Customers
Write code when the Agile Team is facing a lot of work
Develop Roadmaps that guide future activities
Defer improvements so that the team can spend more time creating Stories
Collaborate with Agile Teams to develop Stories with clear acceptance criteria



19. Who typically participates as the train’s Business Owners to approve the team’s PI Objectives?

Product Owners
Product Management
Scrum Masters
System Architects



20. What is the purpose of a Program Epic?

To align Strategic Themes to portfolio investments
To support Lean Portfolio Management in funding Value Streams
To capture Agile Release Train initiatives that cannot be completed in a single Program Increment
To align multiple Agile Release Trains to a common objective



21. Product Management is expected to collaborate in planning the amount of upcoming Enabler work by establishing what?

Team Backlog prioritization
Capacity allocation
Completed Epic acceptance criteria
Accurate User Story sizing



22. How can Product Management leverage market rhythms?

Adjust the delivery of Features to better meet market needs
Adjust the timing of marketing campaigns
Improve the prioritization of Features
Improve the scheduling of Program Increment Planning



23. The first three elements of the Continuous Delivery Pipeline work together to support delivery of small batches of new functionality which are released in accordance with what?

Program Backlog prioritization
Release management governance
Operational support
Market needs



24. Which statement is true about WSJF?

The item with the highest cost of delay is prioritized first
It identifies minimum economic outcomes
It is equal to the cost of delay
It includes cost of delay and the unit of size



25. Communicating the Vision to the Agile Release Train during Program Increment Planning supports which SAFe Core Value?

Transparency
Alignment
Built-in Quality
Program Execution



26. Which two options are part of the SAFe Core Values? (Choose two.)

Transparency
Decentralized control
Program execution
Innovation
Working software



27. What is a common anti-pattern related to System Demos?

Team demos are accepted in place of a System Demo to avoid redundancy
Different team members conduct the demo each Iteration
System demo takes more than 15 minutes
People from outside the Agile Release Train attend the System Demo



28. Which situation best indicates the presence of an innovation riptide?

When team and Agile Release Train innovations turn into portfolio-level strategic initiatives
When teams spend more than half their capacity on innovation
When the company’s Net Promoter Score exceeds 70% on Customer surveys
When innovations are presented during every System Demo



29. The SAFe definition of DevOps includes which three concepts? (Choose three.)

The scale cube
Culture
Clear separation of responsibilities between Dev and Ops
Well-defined handoffs between Dev and Ops
Mindset
Technical practices



30. Which two statements are true about nonfunctional requirements? (Choose two.)

They are associated with backlogs at all four levels of SAFe
They operate as constraints on the design of the system
They provide visibility to large business initiatives
They stay in the Portfolio Backlog until implementation capacity is available
They are split into Features and acceptance criteria is established



31. Who should attend the PO sync?

The Product Owners, Product Management, and other stakeholders as needed
The teams and the RTE
The scrum of scrums participants and the Product Owners
Everyone on the train



32. What are two benefits of Program Increment (PI) Objectives? (Choose two.)

To promote Business Agility by giving teams options on how they might deliver Features
To promote the achievement of business outcomes over the completion of Features
To provide a mechanism for organizing around value
To provide the proper allocation of capacity
To define when the Solution will be released



33. What are two inputs to the Vision? (Choose two.)

Customer feedback
Portfolio Enablers
Strategic Themes
Feature context
Portfolio Backlog



34. The Customer is asking for a forecast for when a specific Feature will be available. Where could Product Management find this information?

Solution Roadmap
System Architecture designs
Development Manager
Program Backlog



35. When should a Product Owner establish Team Objectives?

Following the confidence vote
During Backlog Refinement
Following the Management Review and Problem Solving Meeting
During PI Planning



36. Why is the problem-solving workshop more effective than traditional lessons-learned documents?

It involves more participants
It makes improvements actionable through backlog items for the next Program Increment
Workshops are more engaging than document writing
Collaboration over documentation is a key recommendation of the Agile Manifesto



37. What is the purpose of Iteration Goals?

To align the team members and the Product Owner (PO) to the mission
To hold the team accountable to their goals
To ensure the team accomplishes all the committed Stories each Iteration
To provide the baseline required for measuring the team’s performance



38. What happens to improvement items identified during the Iteration Retrospective?

They are escalated to the Business Owners
They are ROAMed with the rest of the risks
They are given to the Scrum Master who resolves them
They are entered as Stories in the Team Backlog



39. Iteration Goals serve what purpose?

To align team members to a common purpose
To identify nonfunctional requirements
To define the what, the how, and the how much
To set preliminary PI Objectives



40. Who provides Agile Release Train context and Vision during PI Planning?

System Architect
Product Owner
Product Management
Business Owner



41. Which two statements are true about estimating Features using Story points? (Choose two.)

Story point estimation is done on cadence during backlog refinement
User Stories can be estimated from the top-down
WSJF is the best way to estimate Stories
Story points are accurate and provide leadership data
More than one team may be involved in the estimation



42. Product Management is responsible for which three activities? (Choose three.)

Defining Program Backlog content
Developing Story acceptance criteria
Prioritizing Capabilities and Enablers
Assigning Agile Release Trains to a common technological and Architectural Vision
Establishing Features and benefit hypotheses
Prioritizing Features for optimum economic value



43. Which two statements are true about the SAFe backlog model? (Choose two.)

Features are in the Program Backlog
Stories are in the Solution Backlog
Stories are in the Team Backlog
Capabilities are in the Program Backlog
Epics are in the DevOps Backlog



44. Which two responsibilities belong to the Product Owner? (Choose two.)

Accepting Features
Drafting Iteration Goals
Driving PI Objectives
Estimating Stories
Prioritizing the Team Backlog



45. Which design-thinking tool is most likely to help an Agile Release Train (ART) during Program Increment (PI) Planning to ensure that the PI will deliver a Solution that is differentiated from competitive offerings?

Customer journey maps
Personas
Prototypes
Whole-product thinking



46. What are the Safe Core Value

built-in quality
program execution
alignment
transparency



47. Which statement describes the Scaled Agile Framework?

It scales Scrum to multiple Agile Teams
It provides guidelines for Project Managers
It provides strict guidelines for all daily activities
It synchronizes alignment, collaboration, and delivery for large numbers of teams



48. What are the inputs to Program Increment (PI) Planning?

PI Objectives and the program board
Vision, Program Backlog, and top ten Features
Vision, top ten Features, program risks, and Story maps
Vision, Solution Roadmap, Program Backlog



49. What should PI Objectives be based on?

Business and technical goals or Progress towards the hypothesis
Fixed and variable Solution Intent
Customer complaints and feedback
Key performance indicators



50. Features in Program Backlogs can result from what?

Refining the Team Backlog
Decomposing Enabler Stories
Decomposing Epics
Aggregating Stories into Features



51. Business Owners assign business value to the team PI Objectives to accomplish which two tasks? (Choose two.)

To estimate cost
To sequence dependencies
To clarify goals
To centralize control
To decentralize control



52. What is one way splitting User Stories supports flow and small batches?

By allowing testers to start writing test cases before development is finished
By enabling distributed teams to collaborate on the Architectural Runway
By ensuring each Story fits into an Iteration
By allowing Stories to be released before they meet the definition of done



53. What should a team do if they cannot meet their commitments?

Move what cannot be accomplished into uncommitted objectives
Review the objectives and reset them to fit what can be done
Deliver what the team can complete with open issues
Escalate immediately to the Product Owner



54. Which three items are part of the Iteration Review agenda? (Choose three.)

Revise the Team Backlog as needed
Discuss Stories planned for the upcoming Iteration
Present the team’s quality Metrics
Demo and solicit feedback on each Story, spike, refactor, and nonfunctional requirement
Discuss Stories not completed and why
Choose the top improvement item to focus on next Iteration



55. What should be understood in order to achieve the goals of Release on Demand?

How to communicate the release cadence to Customers
How to release Solution elements in a large release
How to separate the release from the development cadence
How to rework the Solution to deliver all the value at once



56. What is the most important Metric to track as part of the quantitative and qualitative measures reported during Inspect and Adapt?

Escaped defects
Program predictability
Feature throughput
Team velocity



57. The role of the Product Owner is most closely aligned with which Agile Manifesto principle?

Business people and developers must work together daily throughout the project
Build projects around motivated individuals
The highest priority is to satisfy the customer through early and continuous delivery of valuable software
Welcome changing requirements, even late in development



58. Which two job roles are good candidates for becoming a Product Owner? (Choose two.)

Business analysts
Line managers
Subject matter experts
Scrum Masters
UX experts



59. Which statement characterizes the perspectives of the definition of done (DoD)?

Product Owners focus on the Iteration while Product Managers focus on the release
Product Owners focus on the release while Product Managers focus on the team increment
Product Owners focus on the Solution while Product Managers focus on the team increment
Product Owners focus on Features while Product Managers focus on Stories



60. What are personas?

External customers that are on the product Roadmap
Strategic stakeholders that influence the backlog
Key end-users the Product Owner leverages for managing the backlog
Fictional characters that act as a representative user when discussing the backlog



61. Which two aspects of the Continuous Delivery Pipeline require the most involvement from Product Managers?

Continuous Integration and Release on Demand
Continuous Exploration and Release on Demand
Continuous Exploration and Continuous Deployment
Continuous Integration and Continuous Deployment



62. What is a recommended time horizon of the Solution Roadmap?

1 year
2-4 years
1-3 years
2 or more years



63. Product Management has content authority for the Program Backlog including: the Vision, the Roadmap, driving the PI Objectives, and what else?

Accepting Stories and team increments
Managing risk, helping to ensure value delivery, and driving continuous improvement
Working with business stakeholders and Solution and System Architects to implement holistic technology across Value Streams
Establishing Features and benefit hypotheses



64. What are two examples of team-level events? (Choose two.)

Backlog refinement
System Demo
Scrum of scrums
Daily stand-up
Program Increment Planning



65. An organization is conducting their first Program Increment Planning session, and the new teams are asked to provide their capacity. Which three actions are part of the initial capacity planning process? (Choose three.)

Subtract one point for every team member’s vacation day, public holiday, or training day
Use eight points per person (adjust for part-time employees)
Compare final team capacity across all teams and make individual team adjustments
Add the points for all the recently completed Features and use that as a baseline for future capacity
Ensure Product Owner/Product Manager approval for all capacity adjustments based on time
Find a small story that takes about a day to develop and call it a one



66. Which statement is true about estimating and forecasting the Portfolio Backlog?

Feature estimates are rolled up into Epic estimates
Epic forecasting is based on the cost estimate
Refinement is necessary when estimating the effort needed to implement an Epic
WSJF is used to assign Epics to Value Streams



67. What two types of dependencies are commonly visualized on the program board? (Choose two.)

Dependencies between teams
Component dependencies
Dependencies related to Features
Dependencies on external suppliers
Epic dependencies



68. What is a recommended time horizon of the Program Increment Roadmap?

2-4 years
2 or more years
1-3 years
Less than 1 year



69. What is one way to establish a team’s velocity?

Calculate the percentage planned versus actual Stories completed during an Iteration
Add the Story points for all the stories planned for the Iteration
Look at The average Story points completed from The last Iterations
Add the Story points for all Features completed in the Iteration



70. In the first step of SAFe’s Continuous Delivery Pipeline, Product Owners and Managers do what activity?

Negotiate Supplier contracts to ensure projected capacity requirements are met
Hypothesize on what would create value to their Customers
Ensure the architecture team has sufficient capacity
Prioritize the backlog



71. What is the primary purpose of PO sync?

To assess progress of the Program Increment and adjust scope and priority as needed
To build objectives for the Program Increment
To align with the scrum of scrums participants on the status of the Program Increment
To conduct backlog refinement



72. What is the primary job of Product Management when considering the Architectural Runway?

Writing the Enabler Lean business case
Prioritizing Enablers using weighted shortest job first (WSJF)
Adding Enablers to the Solution roadmap
Ensuring sufficient capacity is allocated to Enablers



73. A Product Manager is working for an insurance company and is responsible for the internal systems used for managing claims. This is an example of what kind of Value Stream?

Customer journey Value Stream
Development value Stream
Operational Value Stream
Claims processing Value Stream



74. When tracking team progress, what can a Kanban board show the team?

Where the team has too much work-in-process (WIP)
Which team member is behind in their work
A burndown chart of the work completed in the Iteration
How many defects the team is creating



75. What is the importance of the definition of done?

It prioritizes the work of testers on the team
It creates standardized work between all Agile Teams
It provides a way for Scrum Masters to enforce quality
It creates a clear understanding of when items are complete



76. Which function is responsible for ensuring that the Agile Release Train has the content needed to successfully engage in Program Increment Planning?

Release Train Engineer
Product Owner
Lean-Agile Center of Excellence
Product Management



77. What is one way Kanbans are used in SAFe?

To manage Program Increment (PI) Objectives
To manage nonfunctional requirements (NFRs) in the backlog
to manage queue length
To manage runway cadence



78. When should innovation activities be conducted by teams on the Agile Release Train?

Only when innovation Stories rise to the top of the backlog
Only during The Innovation and Planning Iteration
At a consistent time each day during the Iteration
Throughout the Program Increment



79. What are two primary responsibilities of Business Owners in Program Increment (PI) Planning? (Choose two.)

To create Lean business cases
to assign business value
To establish the PI budget
To ensure that team members plan all of their priorities
to set The business context



80. What are the minimum requirements for a Feature?

Benefit hypothesis, acceptance criteria, and priority
Acceptance criteria, data models, and priority
Name, benefit hypothesis, and acceptance criteria
Whatever the Agile Release Train determines is required



81. The goal is a fast delivery process, ideally requiring little manual effort. What is one capability used to achieve this?

Feature toggles
Nonfunctional requirements
Quiet releases
Soft launches



82. Which principle of the Agile Manifesto is most aligned with conducting a System Demo?

At regular intervals the team reflects on how to become more effective
The best way to convey information is a face-to-face conversation
Working software is the primary measure of progress
Welcome changing requirements, even late in development



83. What is enabled by the key components of the Continuous Delivery Pipeline?

End-to-end testing
Accelerated release of value
Predictable release cadence
Hyper-transparent measurements



84. Which Agile Team event supports relentless improvement?

Backlog refinement
Iteration Planning
Iteration Retrospective
Iteration Review



85. How do Product Owners contribute to the Vision?

By communicating emerging requirements and opportunities
By contributing to the portfolio canvas
By continuously exploring emerging markets
By establishing Strategic Themes



86. How do Business Owners quantify the value of PI Objectives?

By estimating return on investment
By totaling the Epic budget
By assigning Story points
By assigning business value



87. An Agile Release Train (ART) has implemented a completely automated Continuous Integration/Continuous Delivery (CI/CD) pipeline that can deploy code as it is checked into the source-code repository.

How might a Product Owner (PO) adjust team events to take advantage of this capability and promote the flow of value?
Release Stories that have been included in the team demo
Identify Stories that are cleared for automatic delivery during Iteration Planning
Implement Feature toggles to control which Stories are released
Review and accept Stories as they are completed



88. What is the relationship between a Product Owner (PO) and Product Management (PM)?

The PO and PM collaborate to determine the architectural runway, pricing, and licensing
The PO and PM spend equal amounts of time on roadmaps and backlogs
The PO is team-oriented; PM is market-oriented
The PO contributes to the Program Backlog; PM establishes Story acceptance criteria



89. In the SAFe work item hierarchy, Features are decomposed into what?

Stories
Tasks
Capabilities
Spikes



90. Product Management works with which other role to define and maintain nonfunctional requirements?

Portfolio Managers
System and Solution Architect/Engineering
System Team
Lean UX



91. What is a benefit of capacity allocation?

It aligns Business Owners to the objectives
It ensures different types of backlog items are not compared against one another
It allocates developers and testers to an initiative
It assigns Architects to backlog items



92. What is included in the Inspect and Adapt agenda?

ROAMing risks
PI Objectives
Quantitative and qualitative measurement
Management review



93. Enabler Epics are used to advance what in order to support upcoming Business Epics?

Compliance
Value Stream(s)
The Architectural Runway
The Program Backlog



94. Epics are decomposed into what?

Stories
Features
Requirements
Enablers



95. What are two different types of Enabler Stories? (Choose two.)

Infrastructure
Impediment
Feature
Defects
Exploration



96. Which role is primarily responsible for working with business teams?

Release Train Engineer (RTE)
Product Owner (PO)
Product Management (PM)
Enterprise Architect



Our Expert Team researched a lot to keep ServiceCentreList.com website updated for certification practitioners for free. You can also contribute by updating new questions or existing question answer(s). We will give the credit for the same by adding your name on the question post. Kindly Comment below with your answers.

 

People Also Searched For: SAFe PO Certification Answers, SAFe PO Certification questions, SAFe PO Certification exam, SAFe PO Certification exam answers, SAFe PO Certification quiz answers, Free SAFe PO Certification.

0 Comment on this Article

Add a comment. ## Do not SPAM, Your comment will not get approved if it has any promotion link or url!!! ##